Before turbines are installed on a wind farm, they have to pass several tests and inspections to verify that they are completely functional.
We have a committed team of professionals who have undergone thorough training to visit ports around the UK and Europe. This is to guarantee that the turbines receive the full preservation works.
We have a dedicated procedure with a component-specific checklist that includes:
In accordance with protocol, dry bags must be placed, internal and exterior damage must be recorded and the components must be placed on the appropriate storage device both at ports and at the job site.
Take a look at one of our preservation case studies.